Skip to content. | Skip to navigation

Rachel Carson Trails Conservancy

Our Generous Sponsors for 2017!

Peoples Natural Gas

The Burke Family ⧫ MacPhail/Soonthornchai Family

Hefren-Tillotson

Sections
Personal tools
You are here: Home Members sgmentzer's Home Lefever Hill Rehabilitation Project Prep Day
Navigation
Mailing lists
Sign up to be notified by email of news and events about:
 
Document Actions

Lefever Hill Rehabilitation Project Prep Day

by Steve Mentzer last modified Apr 12, 2017 02:08 PM

Help repair the Rachel Carson Trail on Lefever Hill

What Rachel Carson Trail Maintenance
When Apr 23, 2017
from 09:00 am to 01:00 pm
Where Lefever Hill lot
Coordinates 40.57473° latitude
-79.82439° longitude

GPX
Contact Name Mark Eyerman
Contact Email
Contact Phone 412-492-0375
Add event to calendar vCal
iCal

We need several people to assist while we cut logs and stakes which will be used as structural members to secure the hillside which has eroded in spots. We need to cut 8 logs, 8'-25' long and approximately 25 stakes to secure them into position. If possible, we'll transport what we can to the work sites. Work includes safety monitor of the chainsaw operator, lifting and carrying. Bring work gloves and water (spare gloves will be available). Meet at the small parking lot at the base of Lefever Hill at Costa Construction adjacent to the railroad tunnel.


Powered by Plone CMS, the Open Source Content Management System

This site conforms to the following standards: